Once the company has an order, it takes time before the balloon can be constructed. A dedicated team of designers must draw up plans and create a computer model. This can take a considerable amount of time, so the production team must be able to work fast to complete the project on time. The sewers cannot even begin until templates are made and cloth is cut. The cloth is even carefully inspected for defects before the cut panels make their way to the sewers. The artwork can be applied in various ways. Sometimes, the designs are dyed into the fabric and other times it is airbrushed or stuck on with adhesive. During this time, the basket, rigging, and burners are constructed in separate process, and then the final balloon comes together with the help of the Engineering Department. None of this would be possible without...
According to Steve Baty, Principal of Meld Studios and Vice President of IxDA, "Getting teams from different parts of an organization to work together effectively often comes down to a question of having some sense of shared enterprise." (Six, 2011) if the Purchasing Department did not have a sense of the time required to construct a balloon, the materials required in the process or the needs of the production staff, things would not move as smoothly. The materials to construct each balloon must be available at the exact moment they are needed, but the
Cameron Balloons is a British company established in 1971 that primarily manufactures hot air balloons. Since then they have grown to production of about 500 balloons per year, with a market share of about 70% of those produced in the United Kingdom. They are well-known for quality, novelty, and their interesting balloon shapes (Harley Davidson, the Sphinx, Beethoven, etc.) (Civilian Air Authority, 2012). With their U.S. facility the company produces
Balloon Factory Cameron Balloon Simulation What did you learn about Cameron Balloons business process? Perhaps the most compelling point of interest in this simulation was the indication that Cameron Balloons employs a consistent workflow process that nonetheless maintains the flexibility for innovation. As one moves through the work-flow simulation, one can see that the development of a Balloon Concept is the initial step and includes the input of the customer, the graphic design
Our semester plans gives you unlimited, unrestricted access to our entire library of resources —writing tools, guides, example essays, tutorials, class notes, and more.
Get Started Now